Case Studies

Al Rayyan Stadium

Ar-Rayyan, Qatar, Qatar
Sonstiges
Al Rayyan Stadium Al Rayyan Stadium

Due to the location of the soccer stadium, energy usage is paramount to ensure efficient and reliant operations, epically for the FIFA Soccer World Cup 2022. The Socomec Multifunction meters were selected to monitor the power usage of a multitude of devices in the soccer stadium. As the Socomec meter has a Modbus RTU network interface, the EZ gateway was selected to connect the 1373 energy meters to the Honeywell BACnet/IP BMS for energy usage visualization and reporting. Once the Socomec data points were available on the BACnet/IP network, configuration and management of these Socomec BACnet objects was easily handled by the BMS team when creating the appropriate dashboards and reports.

Number of Buildings1
Total Area138,606 sq ft
Special Features

This is one of the eight Soccer Stadiums built or rebuilt for the FIFA Soccer World Cup 2022.

Products/Equipment Installed

125 EZ Gateways were installed to connect 1373 Socomc energy meters to the Honeywell BACnet/IP BAS

Systems IntegratedPower Monitoring
Number of Devices1
System Points1000
System IntegratorPower Monitoring
arrow-l-bluearrow-l-warrow-larrow-rarrow-whitecaret-down-hovercaret-downchevron-down-wchevron-downchevron-leftchevron-rightcircle-xclose-menuclosedot-w-actdot-wexternalfacebook-squarehamburgerinstagram-squarelinkedin-squarelist-polygonminuspausepinplayplussearch-greensearchtopic-icontwitter-squarexyoutube-square