{"id":3114,"date":"2023-05-22T16:36:33","date_gmt":"2023-05-22T20:36:33","guid":{"rendered":"https:\/\/bacnetglobal.org\/?post_type=case-studies&p=3114"},"modified":"2023-05-22T16:36:34","modified_gmt":"2023-05-22T20:36:34","slug":"river-rock-casino-resort","status":"publish","type":"case-studies","link":"https:\/\/bacnetglobal.org\/de\/case-studies\/river-rock-casino-resort\/","title":{"rendered":"River Rock Casino Resort"},"content":{"rendered":"\n
The River Rock Casino Resort complex was completed in August of 2005 and runs entirely on the BACnet\u00ae protocol. All MACH-Global\u2122 controllers communicate over IP via a LAN belonging to the parent company, Great Canadian Casinos. BACnet IP is employed to communicate with a Trane BCU for chiller control.
The Reliable Control\u00ae MACH-System system coordinates cooling for a large chiller plant that consists of four chillers and a single heat harvester. There are 20 large, built-up AHUs dedicated to serve the casino and convention centre. The hotel suites are heated and cooled by 250 fan coils with independent control and adjustable guest set-point using SMART-Sensor\u2122 technology. Office and tenant space within the hotel is served by fan coils and VAV boxes.<\/p>\n","protected":false},"excerpt":{"rendered":"
The River Rock Casino Resort complex was completed in August of 2005 and runs entirely on the BACnet\u00ae protocol. All MACH-Global\u2122 controllers communicate over IP via a LAN belonging to […]<\/p>\n","protected":false},"featured_media":0,"template":"","country":[146],"market":[143],"manufacturer":[78,83],"class_list":["post-3114","case-studies","type-case-studies","status-publish","hentry","country-kanada","market-gastgewerbe","manufacturer-reliable-controls","manufacturer-trane"],"acf":[],"yoast_head":"\n