{"id":1199,"date":"2022-06-27T13:44:12","date_gmt":"2022-06-27T13:44:12","guid":{"rendered":"https:\/\/bacnetglobal.org\/?post_type=case-studies&#038;p=1199"},"modified":"2022-08-10T20:09:30","modified_gmt":"2022-08-10T20:09:30","slug":"glens-falls-hospital","status":"publish","type":"case-studies","link":"https:\/\/bacnetglobal.org\/fr\/case-studies\/glens-falls-hospital\/","title":{"rendered":"Glens Falls Hospital"},"content":{"rendered":"\n<p><strong>The Challenge:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Upgrade, simplify and establish internal control over building automation<\/li><li>Reduce energy consumption and costs; improve physical plant&rsquo;s efficiency with a single platform for mechanical systems<\/li><li>Improve patient comfort<\/li><li>Complete control retrofit and mechanical upgrades with no disruption to hospital operations or level of patient care<\/li><\/ul>\n\n\n\n<p><strong>The Players:<\/strong><br>Founded in 1897, Glens Falls Hospital is a 410-bed acute care facility serving a six-county region in upstate New York. The 1 million sq. ft. complex includes a six-floor (plus basement) patient tower, completed in 2006, and a five-floor medical arts building with cancer treatment and outpatient surgical centers.<\/p>\n\n\n\n<p>Over the past two decades, Glens Falls Hospital&rsquo;s building automation had grown into a tangle of three distinct control systems which were poorly integrated and documented. The new patient tower had not been properly commissioned; hospital staff had received little to no training; and with the vendor maintaining proprietary control, \u00ab\u00a0Maintenance was incredibly frustrated with the operating system,\u00a0\u00bb noted Jeremy McDonald, P.E., principal at Guth DeConzo Consulting Engineers.<\/p>\n\n\n\n<p><strong>The Solution:<\/strong><br>The move to the WebCTRL\u00ae system followed Guth DeConzo&rsquo;s 2009 feasibility study which identified potential energy conservation projects. Among the recommendations: improvements to building control.<\/p>\n\n\n\n<p>\u00ab\u00a0Our challenge was to show the hospital that moving forward with WebCTRL was a better path than expanding existing systems,\u00a0\u00bb remarked Brian Johnson, Sales Engineer at Eastern Heating and Cooling, Inc., Automated Logic&rsquo;s regional dealer. \u00ab\u00a0It took more than three years of demonstrations, multiple meetings and interviews with many levels of hospital management. We needed to demonstrate our technical expertise, and hospital management needed to be educated about our resources and technical knowledge to provide 24&#215;7 support for their DDC and HVAC systems,\u00a0\u00bb Johnson continued.<\/p>\n\n\n\n<p>Drawing on its regional success in the healthcare sector, and taking both a consultative and collaborative approach, Eastern developed relationships from the hospital&rsquo;s boiler room to its C-Suite. The company introduced Glens Falls personnel to other healthcare customers as well as its own staff. And it secured referrals from within and outside the hospital.<\/p>\n\n\n\n<p>That approach ultimately paid off. In early 2011, Eastern was awarded a sole source contract for the first phase of the controls upgrade, covering just under half of the hospital&rsquo;s square footage (it has since been awarded a sole source contract for the second and final phase).<\/p>\n\n\n\n<p><strong>The Story:<\/strong><br><em>Controls Upgrade &#8211; a Delicate Operation<\/em><\/p>\n\n\n\n<p>The upgrade proved to be Eastern&rsquo;s largest and most complex healthcare project to date: replacing three control systems with one; re-programming 20,000 automation points across a number of third party systems, many of them with poor documentation; coordinating all work with the consulting engineers, mechanical contractor (Monahan Metals) and hospital; and scheduling spaces designated for Phase I (patient rooms, operating rooms, radiation and dialysis units, etc.) without disrupting hospital operations. One piece of hardware did ease some of the challenge, as well as the expense: Automated Logic&rsquo;s WebZONE\u2122 drop-in control panel, which enabled Eastern to retain existing control enclosures, sensors and wiring.<\/p>\n\n\n\n<p><em>Bottom Line Healthier with Reductions in Energy Usage and Costs<\/em><\/p>\n\n\n\n<p>In the year following its building control and mechanical systems upgrades, Glens Falls Hospital experienced a dramatic 12% reduction in energy consumption, saving $300,000. Among the energy-saving tools the hospital is using is WebCTRL&rsquo;s Environmental Index\u2122, which monitors the relationship between comfort and efficiency. Hospital executives are extremely satisfied with the project and its results.<\/p>\n\n\n\n<p>\u00ab\u00a0Automated Logic has helped our hospital not only conserve energy, but has made our technicians more effective,\u00a0\u00bb said Fred Rohde, Engineering Manager. \u00ab\u00a0(WebCTRL) is such a user-friendly system that some nursing leaders use it as well.\u00a0\u00bb<\/p>\n\n\n\n<p>\u00ab\u00a0I can&rsquo;t say enough about the team from Eastern and Automated Logic,\u00a0\u00bb added Ron Zimmerman, P.E., Vice President\/Plant Operations and Support Services. \u00ab\u00a0They really understood the value of the patient experience.\u00a0\u00bb<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Challenge: Upgrade, simplify and establish internal control over building automation Reduce energy consumption and costs; improve physical plant&rsquo;s efficiency with a single platform for mechanical systems Improve patient comfort [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","country":[38],"market":[42],"manufacturer":[54],"class_list":["post-1199","case-studies","type-case-studies","status-publish","hentry","country-united-states","market-healthcare","manufacturer-automated-logic-corporation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Glens Falls Hospital - BACnet<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Glens Falls Hospital - BACnet\" \/>\n<meta property=\"og:description\" content=\"The Challenge: Upgrade, simplify and establish internal control over building automation Reduce energy consumption and costs; improve physical plant&rsquo;s efficiency with a single platform for mechanical systems Improve patient comfort [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/\" \/>\n<meta property=\"og:site_name\" content=\"BACnet\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-10T20:09:30+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/\",\"url\":\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/\",\"name\":\"Glens Falls Hospital - BACnet\",\"isPartOf\":{\"@id\":\"https:\/\/bacnetglobal.org\/#website\"},\"datePublished\":\"2022-06-27T13:44:12+00:00\",\"dateModified\":\"2022-08-10T20:09:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bacnetglobal.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/bacnetglobal.org\/de\/case-studies\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Glens Falls Hospital\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bacnetglobal.org\/#website\",\"url\":\"https:\/\/bacnetglobal.org\/\",\"name\":\"BACnet\",\"description\":\"BACnet Information &amp; Education\",\"publisher\":{\"@id\":\"https:\/\/bacnetglobal.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bacnetglobal.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bacnetglobal.org\/#organization\",\"name\":\"BACnet\",\"url\":\"https:\/\/bacnetglobal.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bacnetglobal.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bacnetglobal.org\/wp-content\/uploads\/2022\/05\/ashrae-bacnet-logo.png\",\"contentUrl\":\"https:\/\/bacnetglobal.org\/wp-content\/uploads\/2022\/05\/ashrae-bacnet-logo.png\",\"width\":2048,\"height\":417,\"caption\":\"BACnet\"},\"image\":{\"@id\":\"https:\/\/bacnetglobal.org\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Glens Falls Hospital - BACnet","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"fr_FR","og_type":"article","og_title":"Glens Falls Hospital - BACnet","og_description":"The Challenge: Upgrade, simplify and establish internal control over building automation Reduce energy consumption and costs; improve physical plant&rsquo;s efficiency with a single platform for mechanical systems Improve patient comfort [&hellip;]","og_url":"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/","og_site_name":"BACnet","article_modified_time":"2022-08-10T20:09:30+00:00","twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/","url":"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/","name":"Glens Falls Hospital - BACnet","isPartOf":{"@id":"https:\/\/bacnetglobal.org\/#website"},"datePublished":"2022-06-27T13:44:12+00:00","dateModified":"2022-08-10T20:09:30+00:00","breadcrumb":{"@id":"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bacnetglobal.org\/case-studies\/glens-falls-hospital\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bacnetglobal.org\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/bacnetglobal.org\/de\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Glens Falls Hospital"}]},{"@type":"WebSite","@id":"https:\/\/bacnetglobal.org\/#website","url":"https:\/\/bacnetglobal.org\/","name":"BACnet","description":"BACnet Information &amp; Education","publisher":{"@id":"https:\/\/bacnetglobal.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bacnetglobal.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/bacnetglobal.org\/#organization","name":"BACnet","url":"https:\/\/bacnetglobal.org\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bacnetglobal.org\/#\/schema\/logo\/image\/","url":"https:\/\/bacnetglobal.org\/wp-content\/uploads\/2022\/05\/ashrae-bacnet-logo.png","contentUrl":"https:\/\/bacnetglobal.org\/wp-content\/uploads\/2022\/05\/ashrae-bacnet-logo.png","width":2048,"height":417,"caption":"BACnet"},"image":{"@id":"https:\/\/bacnetglobal.org\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/case-studies\/1199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/case-studies"}],"about":[{"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/types\/case-studies"}],"wp:attachment":[{"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/media?parent=1199"}],"wp:term":[{"taxonomy":"country","embeddable":true,"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/country?post=1199"},{"taxonomy":"market","embeddable":true,"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/market?post=1199"},{"taxonomy":"manufacturer","embeddable":true,"href":"https:\/\/bacnetglobal.org\/fr\/wp-json\/wp\/v2\/manufacturer?post=1199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}