{"id":1143,"date":"2022-06-24T18:58:25","date_gmt":"2022-06-24T18:58:25","guid":{"rendered":"https:\/\/bacnetglobal.org\/?post_type=case-studies&p=1143"},"modified":"2022-08-10T19:59:53","modified_gmt":"2022-08-10T19:59:53","slug":"wake-forest-biotech-place","status":"publish","type":"case-studies","link":"https:\/\/bacnetglobal.org\/case-studies\/wake-forest-biotech-place\/","title":{"rendered":"Wake Forest Biotech Place"},"content":{"rendered":"\n
The project included three five-story buildings, representing 242,000sq ft.<\/p>\n\n\n\n
The project involved converting a historical warehouse and machine repair facility, and retrofitting into labs and office spaces.<\/p>\n\n\n\n
The project included the use of the Web-based EC-Net-AX platform for HVAC control, direct integration into mechanical and electrical equipment, energy monitoring and a reporting dashboard.
Controllers installed were ECB Series BACnet programmable controllers.<\/p>\n\n\n\n
The system was engineered and installed to support the building’s anticipated LEED Gold Certification and achieved 31.5 percent in energy costs savings over ASHRAE\/IES Standard 90.1-2007.<\/p>\n\n\n\n
The facility was up fitted to National Park Service standards for preserving historical buildings.<\/p>\n","protected":false},"excerpt":{"rendered":"
The project included three five-story buildings, representing 242,000sq ft. The project involved converting a historical warehouse and machine repair facility, and retrofitting into labs and office spaces. The project included […]<\/p>\n","protected":false},"featured_media":0,"template":"","country":[38],"market":[45],"manufacturer":[64],"acf":[],"yoast_head":"\n