Fergus Falls Public School District
Fergus Falls, MN, United StatesThis project was a retrofit of 3 school buildings within the District, during which the facilities were occupied, requiring minimization of down time of mechanical equipment.
The EC-NetAX Web-based building management platform was used for integrated control and monitoring of HVAC and lighting systems and for fuel oil tank monitoring.
Controls retrofit included HVAC and outdoor lighting using BACnet ECB Series controllers, Allure communicating thermostats and EC-Light lighting control panels
The schools now have a building automation system accessible via the Web, providing a complete user interface for the control and monitoring of their BMS, including all graphics, schedules, alarms, trends and logs, and other reports.
This enables them to monitor their entire building’s comfort levels and the operation of the equipment, and make changes as needed from any location rather than manually adjusting each unit.