Jun 27, 2022The Centre for Applied Technology (CAT) is the largest building on Northern Alberta Institute of Technology’s (NAIT) Main Campus, covering 51,600 square meters while hosting approximately 5,000 full-time students. CAT […]
Read more
Jun 27, 2022When Public Health Ontario (PHO) relocated its largest laboratory from Etobicoke to the MaRS Discovery District in downtown Toronto, Modern Niagara provided the fit-up of an integrated, state-of-the-art Building Controls […]
Read more
Jun 27, 2022A web-based EC-NetAX platform was used to integrate HVAC and lighting control, utility monitoring, and multiple environmental sensors. The project was designed and implemented according to LEED guidelines. The new […]
Read more
Jun 24, 2022This project was a retrofit of an existing school building. The Building Automation System was designed to accommodate the planned future expansion without any modification, but to still operate air […]
Read more
Jun 24, 2022The Upper River Valley Hospital is a 70 bed health care facility located in Waterville New Brunswick Canada. The Hospital was built using LEED strategies and achieved LEED Silver status. […]
Read more
Apr 22, 2022Reliable Controls Authorized Dealer, Independent Control Services, Ltd. recently completed a project transforming an unoccupied bowling alley into a LEED® Silver targeted facility used for office space. The networked hardware […]
Read more
Apr 22, 2022The Challenge: Design, install and commission mechanical and control systems consistent with a LEED® certifiable project Attain energy efficiency performance exceeding national standard for buildings by 35% Maintain comfortable work […]
Read more
Apr 22, 2022One of the most complex facilities of its kind, the Air Mobility Training Centre (AMTC), located at 8 Wing at CFB Trenton, was built to house the equipment and personnel […]
Read more
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok