Jun 28, 2022Ottawa Train Yards is Ottawa’s first centrally located retail power center and office development; it houses over a half million square feet of retail space, covering over 92 acres of […]
Read more
Jun 28, 2022The Reliable Controls® HQ Annex is a naturally ventilated LEED Platinum targeted facility, designed to operate using 50% less energy than the ASHRAE 90.1(1999) standard. LEED points were achieved in […]
Read more
Jun 28, 2022The River Rock Casino Resort complex was completed in August of 2005 and runs entirely on the BACnet® protocol. All MACH-Global™ controllers communicate over IP via a LAN belonging to […]
Read more
Jun 28, 2022About the Hotel: Set in Vancouver’s downtown core at the intersection of West Georgia and Thurlow Street, Shangri-La Hotel, Vancouver occupies the first 15 floors of a new 61-story landmark […]
Read more
Jun 27, 2022The Reliable Controls® MACH-System installed at Metrotown controls the HVAC in twin 30-storey office towers, exhaust systems for a one million square foot parkade, controls four boiler plants and six […]
Read more
Jun 27, 2022Designed in 1930 by the world renowned architect Benjamin Brown, the Balfour Building stands as one of the premier historical structures in the heart of downtown Toronto. Located on the […]
Read more
Jun 27, 2022The Centre for Applied Technology (CAT) is the largest building on Northern Alberta Institute of Technology’s (NAIT) Main Campus, covering 51,600 square meters while hosting approximately 5,000 full-time students. CAT […]
Read more
Jun 27, 2022When Public Health Ontario (PHO) relocated its largest laboratory from Etobicoke to the MaRS Discovery District in downtown Toronto, Modern Niagara provided the fit-up of an integrated, state-of-the-art Building Controls […]
Read more
Jun 27, 2022A web-based EC-NetAX platform was used to integrate HVAC and lighting control, utility monitoring, and multiple environmental sensors. The project was designed and implemented according to LEED guidelines. The new […]
Read more
Jun 24, 2022This project was a retrofit of an existing school building. The Building Automation System was designed to accommodate the planned future expansion without any modification, but to still operate air […]
Read more
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok